2021 Sewer Project
2017 Feasibility Study
Information from previous sewer studies can be found here.
- 1983 TOP Wastewater Management Study Phase I Report (PDF, 41.9MB)
- 1984 TOP Wastewater Management Study Supplementary Phase I Report (PDF, 16.8MB)
- 1985 TOP Wastewater Management Plan Phase II Report (PDF, 124.3MB)
- 1989 TOP Sewer Project Feasibility Study (PDF, 49.9MB)
- 1992 TOP Wastewater Collection, Treatment and Disposal Preliminary Design Report – Volume 2 (PDF, 80.4MB)
- 1992 TOP Wastewater Collection, Treatment and Disposal Preliminary Design Report – Volume 1 (PDF, 22.7MB)
- 2000 TOP Downtown Revitalization Master Plan (PDF, 3.2MB)
- 2004 TOP Downtown Revitalization Area Clustered Wastewater Treatment System(s) Master Plan (PDF, 18 MB)
- 2010 TOP Wastewater Treatment & Collection System Feasibility Study for the Downtown Community Cluster System (PDF 2.2MB)
- 2012 TOP Wastewater Treatment Historical Background and Comparative Analysis (PDF, 2.9MB)